Clearance Sheet R2013-003145

 Department IssuesSigned OffIntl

1.  The revised details, submitted 3/28/14, can be approved, but do not address the HOLD Inspection or the most recent comments, dated 3/24/14.

(2) HOLDS remain in place.

Please see comments, below. 

 

2.  (2) Holds remain.

1-Hold all inspections for complete signed/sealed/dated pile installation report.

2-Hold Inspection 106 for beams and deck joist calculations.

 

3.  Copy of previous comment.  Please address.

3. A "Pile Installation Log" was submitted, but did not include the Pile Inspection Report.  Please provide the Pile Inspection Report including a statement that the third-party inspector was on site for the entire installation process and site conditions.
Please clarify "Jet, Drill, Jet, Hammer" procedure, specify equipment used, final blow count or method used to determine final resistance, and date of each pile installation. 

 
General Notes: Your re-submittal shall include two complete sets of plans. Please insert the revised pages into the plan sets, and pages removed from the stamped "Job copy" set, shall be marked as "old set" and shall be included in the re-submittal.
If old "Job copy" drawings, are not resubmitted there will be additional plan review fee charged due to the amount of time necessary to review entire drawing again.
ALL ITEMS changed or revised on plans and documents shall be identified by circling, clouding or identified by some other legible method. ADDITIONAL ITEMS MAY BE REQUIRED - DEPENDING ON INFORMATION AND CLARITY OF FINAL PLANS SUBMITTED FOR REVIEW.
 
AS PER ORDINANCE # 98-42 An additional fee due and payable at permitting shall be of $100 each for any second resubmission of plans. Per FL. Statute 553.80(2)(b), on any third and subsequent resubmissions that do not correct a code violation that is specifically and continuously noted in each previous rejection, a fee of four times the amount of the fee attributed to plan review will be charged.