Clearance Sheet C2026-001673

 Department IssuesSigned OffIntl

Plans for a 573 head NFPA 13 fire sprinkler system for a new 2 story educational facility.  The system has 2 separate risers: Riser 1 which covers the southern wings and gymnasium with a remote FDC, and Riser 2 which covers the northern wings and has a wall mounted FDC.  The system is designed with 4 remote areas as Light hazard .10 density. 


                                                        
Reviewed using FFPC 8th edition effective Dec. 31, 2023.
Reviewer: PJ Webb 904 209 1744 pwebb@sjcfl.us
 
To schedule fire inspections please call 827-6842 (automated system). Questions about inspections please call 209-1740x1.
Review by the AHJ shall not relieve the applicant of the responsibility for compliance with the Code.
 
For questions regarding comments you may reach me at either: 904 209 1744 or pwebb@sjcfl.us.

11/10/2026 PWebb

RESUBMITTING:
A. Make necessary changes and resubmit everything in person to the permit center. You may not make handwritten alterations on signed and sealed plan pages.
B. Once at the Permit Center swap out altered pages or insert new pages in EACH plan set (Job and Office). One copy of the removed/old pages will need to be submitted and marked "OLD". Do not forget to remove pages for work not associated to this permit. All plan papers must be the same size.
C. Provide a response to comments along with any supporting documentation. Response to comments is REQUIRED not optional.
- The response to comments sheet will need to include a response to each numbered comment and tell us where in the plans the comments was addressed. EX - "Top Left of Page E1-1" or "Page E1 Note 8".
- Code responses shall reference Florida Fire Prevention Code, 8th Ed. NFPA 1:1.12.4</span

11/10/2026 PWebb

1) Per the approved fire main plan, both risers have yard FDC's.  Riser 2 is indicated to have a wall FDC.  Ensure that you plans match the approved underground plans.

-----------

Tuesday, November 10, 2026 PJW- Per RTC, "Sheets FP-00 and FP-01B have been revised to show both FDC's as Yard FDC's."    

11/10/2026 PWebb

2) Unable to locate air vent on the plans in accordance with NFPA 13:8.1.5, if provided please callout on the plans. 

------------

Tuesday, November 10, 2026 PJW- Per RTC, "Automatic air vents have been added to Sheets FP-02B in Stair #3, and FP-02C."

11/10/2026 PWebb

3) Hydraulic calculations for remote area 2 were provided twice.  Provide hydraulic calcs for remote area 3.  NFPA 13:27.4.1.

-----------

Tuesday, November 10, 2026 PJW- Per RTC, "Hydraulic calculations have been revised accordingly." 

Tuesday, November 10, 2026 PJW Reviewer Response- Calcs for remote area 3 provided. 

11/10/2026 PWebb

4) If you are installing the EZPac trim with the built in pressure release, indicate this on the plans.  Or otherwise provide the pressure release as required by NFPA 13:8.1.2.1.

-----------

Tuesday, November 10, 2026 PJW- Per RTC, "Sprinklermatic will be utilizing TYCO RM-2 Riser Manifold, with TD-2 Test & Drain Valve with integral pressure relief.  Sheet FP-01B Riser Detail has been revised to show this, and product submittal data has been revised accordingly as well."

11/10/2026 PWebb

5)  Provide spec sheet for suspended ceiling tile grid showing it meets ASTM C635/C635M. NFPA 13 17.4.1.3.3.2.   Flexible sprinklers shown in product data.

-------------

Tuesday, November 10, 2026 PJW- Per RTC, "The General Contractor has provided a spec sheet for the Prelude XL Ceiling Grid that is to be used on this project, showing ASTM C636 compliance. Two copies of this submittal have been provided with this comment response."

11/10/2026 PWebb

6) Provide FDC signage for each yard FDC indicating which riser is supplied (1 or 2) and which geographical portion of the building is supplied by description.  Example: Riser 1- South Wings/Gymnasium (or similar)  Riser 2- North Wings/Administration (or similar).  In addition provide signage on both riser room walls or doors facing the FDC's that match the FDC signs.

-------------

Tuesday, November 10, 2026 PJW- Per RTC, Sheets FP-00 and FP-01B have been revised to callout which FDC supplies which system.  In addition, Fire Protection Signage spec sheets are included on page 271 of the project submittal data. "

Tuesday, November 10, 2026 PJW- The fire inspector will verify at final that the signage provided is clear based on the comment above.

 

11/10/2026 PWebb

7) Provide note on FP-01A indicating that Waiting 100 will be covered from above similar to the notes for Gymnasium and Chapel. 

-------------

Tuesday, November 10, 2026 PJW- Per RTC, "Sheet FP-01A has been revised to show Waiting 100 as being covered from above." 

11/10/2026 PWebb

8) No head indicated at the top of the elevator shaft.  Cite exemption per NFPA 13:9.3.6.

11/10/2026 PWebb