1) 61G15-32.004(2) a-m Form on Sheet FP001, permit #12416218, Signed by Engineer Michael Wernz calls out in part the following:
· General Storage (Parts and Parts Mezzanine): 0.60gpm/SF over 4,000srft (or entire compartment), K-Factor:11.2 or higher, 100 SF max per sprinkler, Pendent Quick Response.
o Sprinkler Plans call out First Floor Parts area having density of .20/1,500 SF, K:5.6, Quick Reaction Upright
o Sprinkler Plans call out Second Floor as having density of .20/1,500 SF, K:8.0, Quick Reaction Upright
· Industrial Occupancy (Shop): Calls for Standard Response Head
o Sprinkler Plan calls out Shop area to have Quick Response Heads
a) Update the plans to match the 61G15-32.004, OR
b) Have the Sprinkler Plans Signed and Sealed by a Fire Protection Engineer.