Plan reviewed for underground fire main for Hasting Event Center.
- 6"x6" tapping sleeve.
- 6" tapping valve.
- 6" DCDA BFP(insulated)
- 5" Storz FDC(30 degree downward deflection) connected to BFP with a 4" check valve with ball drip to be kept dry.
- 6" DR-18 fire main
- 6" in building riser finishing 1' AFF.
Reviewed using FFPC 8th edition effective Dec. 31, 2023. NFPA 1 and 101 references are Florida Editions of the code in the FFPC.
Reviewer: Stuart Schnellenberger 904-209-1778, SSchnellenberger@SJCFL.US
To schedule fire inspections please call 827-6842 (automated system). Questions about inspections please call 209-1740x1.
Review by the AHJ shall not relieve the applicant of the responsibility for compliance with the Code.