| | Department Issues | Signed Off | Intl |
|
|
1. Please update plans to the current code cycle - 2023 Florida Building Code, 8th Edition and the 2020 National Electrical Code.
|
6/21/2024
| jedwards |
|
|
2. It is not possible to perform a complete review with all of the deferred submittals listed on the cover page. Please provide all of the necessary information for a complete interior buildout plan review to include MEPs, structural, framing and fall protection.
|
6/21/2024
| jedwards |
|
|
3. 2023 FBC-Plumbing Table 403.1 shows that 2 drinking fountains shall be provided for an occupant load of 900.
|
6/21/2024
| jedwards |
|
|
4. The plumbing plans are not complete. For example, there is no hot water heater detail. Also, page G101 shows a water fountain but P1 does not show a water fountain.
|
6/21/2024
| jedwards |
|
|
5. Page P3 shows a Fat/Oil/Grease pipe. Will there be cooking at this kitchen? Is there an existing grease trap?
|
6/21/2024
| jedwards |
|
|
6. The number of water closets provided for men and women shown on the plans does not match the number stated at the top of page G101. Please clarify. Please also note that a unisex bathroom or staff bathroom cannot count towards to the total number of fixtures required for both men and women. Therefore, there are not enough water closets for either sex.
|
6/21/2024
| jedwards |
|
|
General Notes: Your re-submittal shall include two complete sets of plans. Please insert the revised pages into the plan sets, and pages removed from the stamped "Job copy" set, shall be marked as "old set" and shall be included in the re-submittal. If old "Job copy" drawings, are not resubmitted there will be additional plan review fee charged due to the amount of time necessary to review entire drawing again. ALL ITEMS changed or revised on plans and documents shall be identified by circling, clouding or identified by some other legible method. ADDITIONAL ITEMS MAY BE REQUIRED - DEPENDING ON INFORMATION AND CLARITY OF FINAL PLANS SUBMITTED FOR REVIEW.
|
6/21/2024
| jedwards |
|
|
7. NEW COMMENT: The Mechanical plans are not complete. Please provide a duct layout page. Please show the Bathroom exhaust systems. Show in the plans the total number of new HVAC units and their tonnage. Please note that 2020 FBC-Mechanical 606.2.1 requires smoke detectors to be installed on the supply side of air-handling systems having the capacity greater than 2,000 cubic feet per minute. Show how the AC units will be mounted on the roof. Show condensate details. Provide a complete set of mechanical plans.
|
7/31/2024
| jedwards |
|
|
8. NEW COMMENT: Page G101 shows (3) Single-User Toilet facilities. I only see 2. Please update plans accordingly. The plumbing fixture count is code compliant.
|
7/31/2024
| jedwards |
|
|
General Notes: Your re-submittal shall include two complete sets of plans. Please insert the revised pages into the plan sets, and pages removed from the stamped "Job copy" set, shall be marked as "old set" and shall be included in the re-submittal. If old "Job copy" drawings, are not resubmitted there will be additional plan review fee charged due to the amount of time necessary to review entire drawing again. ALL ITEMS changed or revised on plans and documents shall be identified by circling, clouding or identified by some other legible method. ADDITIONAL ITEMS MAY BE REQUIRED - DEPENDING ON INFORMATION AND CLARITY OF FINAL PLANS SUBMITTED FOR REVIEW.
|
7/31/2024
| jedwards |