1) Submitted shop drawings indicate storage up to 12' in height with .20gpm/sf over most remote 1500sf using 250gpm outside hose allowance.
The Owners Information Certificate and sprinkler EOR indicate that storage is going to be 16' high. Looking at sprinkler EOR's criteria, he classified this rack storage as high piled which covers approx. 50% of the structure. His design calls for .22 GPM/sf over most remote 2000sf plus 500gpm outside hose allowance.
Florida Administrative Code (FAC) 61G15-32.002 defines a material deviation as "Any deviation from the design parameters established and documented by the Engineer of Record." Furthermore FAC 61G15-32.003(6) states "When layout documents contain material deviation from the Engineer of Record's Fire Protection System Engineering Document, such layout documents are not compliant unless they are accompanied by revised Engineering Documents made and sealed by the Engineer of record for the Fire Protection System."
Either:
a) submit revised signed/sealed engineering criteria from original EOR to match shop drawings or
b) have shop drawings match engineering design criteria.