Clearance Sheet C2021-004882*012

 Department IssuesSigned OffIntl

Plan reviewed for 2 story 18828sf construction type VB sprinklered 1hr separated assembly (golf clubhouse) and storage (golf cart). Reviewed 1st floor as new assembly and lower floor as ordinary storage using FFPC 6th edition effective Dec. 31, 2017.

Reviewer: 
V.Vitori 904 209 1748

 
To schedule fire inspections please call 827-6842 (automated system). Questions about inspections please call 209-1740x1.
Review by the AHJ shall not relieve the applicant of the responsibility for compliance with the Code.

3/29/2022 VVitori

RESUBMITTING: Please make necessary changes and resubmit the complete permit application package. Response to comments / plans / specifications should be submitted to the Permit Center as a resubmission for the original project unless other arrangements are made with the Fire Plan Reviewer or the Fire Plan Review Supervisor.

To help speed the review process you should include a written response to comments summary to clarify and/or illustrate corrections on plans (bubbling, highlighting, or notations are best). Please use the Florida Fire Prevention Code 6th Ed. for all code reference in a response to comments. You are required to remove old pages and reinsert the new pages.

The numbered items require a response or plans to be updated to complete the review.

3/29/2022 VVitori

1) This is a preliminary review. Do not resubmit until clearance sheet obtained.

Reviewer: Do not forget to update address.

NOTE: Based on fire's site review, additional comments may be provided. Do not forget to include all clearance sheets for all included structures in plan set (ex-bocce ball shade structure page CHS1.2).

Tuesday, January 18, 2022 No other clearance sheets added for additional structures. Remove all pages that make reference to work that will be permitted separately (CHS1.2 bocce ball shade structure) OR provide clearance sheet(S). 

Tuesday, March 29, 2022 Bocce Ball clearance sheet provided.  c21-4882*13

3/29/2022 VVitori

For Contractor:

This building is more than 10,000 square feet and, two or more stories in height. This will require a third party contractor to conduct a two-way radio communication test in accordance with NFPA 1:11.10 and NFPA 72 (2013 Edition)  by the time of the 105 framing inspection.

NOTE: A copy of this report must be provided and submitted to our office as a revision before the 105 framing inspection.  A 105 Framing Hold has been placed until receipt of the revision.

-Should the third party contractor’s two-way radio communication test pass at the framing stage, a copy of the third party testing documentation will need to be submitted for review. Once the documentation has been received, the 105 framing hold will be removed.

-Should the third party paperwork indicate that the test is not satisfactory, the contractor will then have to submit a building permit revision. The revision will need to include: the unsatisfactory test paperwork, outline of corrective measures, and plans to illustrate the corrective measures to meet requirements provided by the design professional.

If the building is required to have an In Building Radio Enhancement System, at the Fire Final you will be required to provide the Fire Inspector the third party contractor’s satisfactory testing documentation following the installation and testing of the In Building Radio Enhancement System. A hold will be placed for this documentation at the building permit fire final.

Tuesday, January 18, 2022 Response to comments indicate "Refer to Sheet C-LS1.0, note was added regarding Two-Way Radio Test."

1/18/2022 VVitori

INFORMATIONAL ONLY NO RESPONSE NECESSARY:
The system(s) outlined in this set of plans is conceptual.

A HOLD has been placed at insulation inspection (109) until a permit has been pulled :

- fire alarm system (duct detector page CE3.4/CE3.5, hood/suppression, voice evac. 101:12.3.4.3.3, supervised 101:6.1.14.4.1, HVLS shut down 13:11.1.7, lighting sensor see comment 6)
- fire sprinkler system (HVLS exterior 72" ceiling fan pages CA1.6-1.7  13:11.1.7, lower level has 2 roll up garage doors,
- fire underground
- kitchen hood
- kitchen suppression system
- Fire/smoke damper inspections

- in building radio test (CLS1.0)

1/18/2022 VVitori

INFORMATIONAL ONLY NO RESPONSE NECESSARY:
At the time of fire final be prepared to provide a copy of the manufacturer specification sheets to the fire inspector showing that each interior finish will meet:

- wall and ceiling finish in corridors, lobbies and stairways shall be Class A or B.

- wall and ceiling finish in stairways shall be class A. 101:12.3.3.2

- wall and ceiling finish will meet Class A, or B. 101:12.3.3.3

- floor finish in exit access corridors shall be Class II. 101:12.3.3.5.2

- floor finish shall meet either: a) ASTM D 2859 for carpet and carpet like materials or b) has a minimum critical radiant flux of .1 W/cm2 for non carpet flooring. 101:12.3.3.5.3.

If there are multiple finishes, label each spec sheet identifying each product, its location AND highlight the area showing illustrating it meets the applicable Code requirement.

1/19/2022 VVitori

2) Front doors are only 6' wide which will accommodate only 327p. Increase main entrance/exit width to accommodate the required one-half occupant load of this level. 101:12.2.3.6.4

Tuesday, January 18, 2022 Response to comments indicate "Please refer to existing Sheet LS1.0, the Chart labeled "Building Occupancy Egress Count", the Total Ground Floor Occupancy is listed as 591, half of 591 is 296, thus the front door will accommodate more than half since it will accommodate 327."

1/19/2022 VVitori

3) CE3.1 doesn't show an exit sign going from movement studio rm 138 to fitness studio rm 136. Label 2nd means of egress. 101:7.10.2.1

NOTE: 101:12.2.5.1.2 requires rm 138 to have 2 means of egress.

Tuesday, January 18, 2022 Response to comments indicate "Refer to Revised Sheets C-LS1.0, C-A1.6 and C-E3.1 for requested signage."

1/19/2022 VVitori

4) CE3.1 doesn't show an exit sign going from flex room 109 to hobbies and crafts rm 110. Label 2nd means of egress. 101:7.10.2.1

NOTE: 101:12.2.5.1.2 requires rm 109 to have 2 means of egress.

Tuesday, January 18, 2022 Response to comments indicate "Refer to Revised Sheets C-LS1.0, C-A1.7 and C-Ee.2 for requested signage."

1/19/2022 VVitori

5) Several doors (100, 128, 107, 123b) on page CLS1.0 are shown to have panic hardware but are also showing that they will also have "card readers". How does door card reader release the door?

Clarify card readers as standard locking arrangement, electronically controlled egress (101:7.2.1.5.6), or access controlled egress (101:7.2.1.6.2 and 101:12.2.2.2.6). Then show compliance with respective requirements.

Tuesday, January 18, 2022 Response to comments indicate "Ingress with Card Reader and Free Egress with Panic Hardware through use of Electric Strikes - Genesis 9600 Series"

1/19/2022 VVitori

6) Pages CE3.1 and CE3.2 show occupancy lighting sensors throughout. Many of the stairs, aisles, corridors, ramps, and passageways leading to an exit were provided with minimal night lights. Either:

a) provide a photometric plan showing the night lighting alone will provide enough standard illumination required by 101:12.2.8.  OR

b) show that standard illumination controlled by sensors in stairs, aisles, corridors, ramps, and passageways leading to an exit meet all of 101:7.8.1.2.2.

Tuesday, January 18, 2022 Response to comments indicate "Lighting controls comply with 7.8.1.1.1 Specifically: 1) control devices are listed; 2) Emergency lighting units are equipped with battery ballasts to energize upon normal power failure; 3) Time delay has been referenced on Sheet C-E1.1; 4) All lighting controls in corridor are auto on; 5) Lighting controls in corridor are to be tied to the fire alarm upon activation of the fire alarm; 6) Not Applicable and 7) A constant hot conduct will be provided to all exit and emergency lights"

1/19/2022 VVitori

7) Point out location where specifics of alternating tread stairs and handrails meet 101:7.2.11.2 and 101:7.2.11.3.

Tuesday, January 18, 2022 Response to comments indicate "Added Alternating Tread Stair Detail 3 on Sheet C-A7.5 and detail reference on Sheets C-A1.1 and C-A1.2"

1/19/2022 VVitori

8) Looking at page CLS1.0, outside stair leading to lobby rm 128 has handrails that are approximately 9.5' apart. 101:7.2.2.4.1.2    Show handrails within 30" of all portions of the required egress width.

Tuesday, January 18, 2022 Response to comments indicate "Refer to Revised Sheets CLS1.0 and C-A7.2 for added Intermediate handrail as requested"

1/19/2022 VVitori

9) Page CFS1 item number 47 indicates CO2 tanks. Call out tank sizes in pounds. If over 100 lbs, show compliance with 1:63.3.1.2.4.

Tuesday, January 18, 2022 Response to comments indicate "Refer to Revised Sheet CFS1 for requested information" Page CFS1 shows 15lb CO2.

1/19/2022 VVitori

10) Lower level storage only has 1 exit. Need 2nd exit. 101:42.2.4.1  

NOTE: Common path measured 120' and 144'.

Tuesday, January 18, 2022 Response to comments indicate "Refer to Revised SheetsC-A1.4, C-A1.8, C-A2.2, C-A2.3 and C-A5.7 for additional exist as required, see C-LS1.1 for distance between doors." Electrical page C-E3.3 does not reflect the changes. Make sure exit sign locations match changes shown on C-LS1.1

1/19/2022 VVitori

11) Will cart repairs take place in basement?    1:30.2

Tuesday, January 18, 2022 Response to comments indicate "No cart repair will take place"

1/19/2022 VVitori

12) Provide copy of golf cart and battery charger manufacturer specification sheets. If ventilation is required by manufacturer (or any other specific requriements) , be prepared to show ventilation (or other requirements) meet manufacturer specs.

Tuesday, January 18, 2022 Response to comments indicate "Venting Calculation: Golf cart storage area = 3852sf x 7'-2" ceiling - 27,616 CF    Recommended five (5) air changes per hour = 27,619CF x 5/60 = 2301 CFM     ER-1= 4000CRFM    4000x60/5 divided by 27,619CF = 8.69 air changes per hour  Current ventilation system provide 8.7 air changes per hour

 

Battery Charger Specification Delta - Q IC650 650W Battery Charge, see attached cut sheets"

1/19/2022 VVitori