Clearance Sheet C2020-002968

 Department IssuesSigned OffIntl

Beau Clark-Whitestone Construction 904-660-2904

Plan approved for 4" DCDA to freestanding FDC to 4" fire sprinkler line to finish 1 ft above finish floor.

3/1/2021 SMurray

Fire Dept Connection shall:
- 36" clearance in front and side of FDC
- Have check valve (NFPA 13)
- Have caps in place. (NFPA 24 5.9.1)  

3/1/2021 SMurray

General Requirements:
- Top of the pipe shall be buried not less than 2 1/2 ft to prevent mechanical damage (NFPA 24:10.4.3)
- Pipe under driveways shall be buried at a minimum depth of 3 ft (NFPA 24:10.4.4)
- All aboveground pipe (including backflow) shall be protected against freezing. (NFPA 24:10.5.1)
- Backflow preventer shall be chained and locked unless otherwise required by the Fire or Bldg Code (NFPA 24:6.7.2)

**Pipe being installed is required to be pressure tested. If it is an extension of existing pipe, new pipe must be isolated by a valve or the entire pipe will be required to be pressurized back to the backflow preventer.**

3/1/2021 SMurray

To schedule a fire inspection BEFORE cover up of pipe, use the automated system: please call 904-827-6842 press 1, enter building permit 12008469 and enter appropriate code for sprinkler underground visual(638), sprinkler underground hydro(605), sprinkler underground flush(637)
OR call 904-209-1740 press 1, then press 2.

INFORMATIONAL: Your permit fee includes the cost of review, one hydrostatic test inspection and one final inspection. If you will require more than one hydro/visual inspection you will need to call 209-1740 x 1 to arrange payment.  

3/1/2021 SMurray