Plans for what appears to be 2 abutted kitchen hoods as follows:

CaptiveAire Hood 1 GH-1A- 8'9" hood
CaptiveAire Hood 1 GH-1B- 6' hood

Unclear on the scope. 


                                                        
Reviewed using FFPC 7th edition effective Dec. 31, 2020.
Reviewer: PJ Webb 904 209 1744 pwebb@sjcfl.us
 
To schedule fire inspections please call 827-6842 (automated system). Questions about inspections please call 209-1740x1.
Review by the AHJ shall not relieve the applicant of the responsibility for compliance with the Code.
 
For questions regarding comments you may reach me at either: 904 209 1744 or pwebb@sjcfl.us.

 

RESUBMITTING:
A. Make necessary changes and resubmit everything in person to the permit center. You may not make handwritten alterations on signed and sealed plan pages.
B. Once at the Permit Center swap out altered pages or insert new pages in EACH plan set (Job and Office). One copy of the removed/old pages from the JOB Copy will need to be submitted and marked "OLD". Do not forget to remove pages for work not associated to this permit. All plan papers must be the same size.
C. Provide a response to comments along with any supporting documentation. Response to comments is REQUIRED not optional.
- The response to comments sheet will need to include a response to each numbered comment and tell us where in the plans the comments was addressed. EX - "Top Left of Page E1-1" or "Page E1 Note 8".
- Code responses shall reference Florida Fire Prevention Code, 8th Ed.

 

1) On the larger sheets, GH-1A is indicated, GH-1B is struck through.  However small 8 1/2x11 sheets have been provided for what appears to be GH-1B.  Clarify the scope of the project. 

 

2) If the small GH-1B plans are part of the project, provide the sheets full size.  The small sheets are not legible especially when they are archived. 

 

3) Sheet M-5.1 the ductwork for GH-1A is light color except for replacement of the transition fitting.  Is this all that is being performed on GH-1A?

 

 

4) What is the wall behind the hood and the cooking equipment constructed of?  Demonstrate compliance with NFPA 96:4.2 or 4.2.3 all the way from the top of the hood to the floor. 

Info Note: Even with metal studs, 3” clearance is required to gypsum wall board.  Most hoods have a 3” standoff built in, however the same must be provided all the way to the floor. 

 

 

5) Will the ducts be fabricated or listed assemblies?  If listed provide the listing information.  Also indicate the sealant that is required in the listing as well as the testing method. 

They appear to be fabricated, please confirm. 

 

 

6) Demonstrate clearance to combustibles.  If you plan on wrapping the duct to reduce clearances, provide specifications for the proposed wrap.  NFPA 96:4.2.1

Wrap is indicated for GH-1A on sheet M-5.1.  I do not see an indication for GH-1B. 

 

7) Identify the means in which the fan will be activated when any appliance is turned on in accordance with NFPA 96:8.2.3.3

 

8) Vertical Duct:  Identify the height of any required duct openings (cleanouts).  If not easily accessible from the ground or a 10’ step ladder, safe access and a work platform will be required per NFPA 96:7.4.2.3. 

 

9) Provide a floor plan identifying the location of the hood(s) in the building.