Plan submitted for 860sf expansion and renovation to existing 24527sf sprinklered mercantile structure. Reviewed addition and renovation to existing mercantile as using FFPC 8th edition effective January 1, 2024. Review by the AHJ shall not relieve the applicant of the responsibility for compliance with the Code.

Reviewer: V.Vitori   
For questions regarding comments you may reach me at either: 904 209 1748 or vvitori@sjcfl.us.
To schedule fire inspections call 827 6842 (automated system).
Questions about inspections or resubmitting your plans call 209 1740x1.

7/17/2024 VVitori

RESUBMITTING:
A. Make necessary changes and resubmit everything in person to the permit center. You may not make handwritten alterations on signed and sealed plan pages.
B. Once at the Permit Center swap out altered pages or insert new pages in EACH plan set (Job and Office). One copy of the removed/old pages from the JOB Copy will need to be submitted and marked "OLD". Do not forget to remove pages for work not associated to this permit. All plan papers must be the same size.
C. Provide a response to comments along with any supporting documentation. Response to comments is REQUIRED not optional.
- The response to comments sheet will need to include a response to each numbered comment and tell us where in the plans the comments was addressed. EX - "Top Left of Page E1-1" or "Page E1 Note 8".
- Code responses shall reference Florida Fire Prevention Code, 8th Ed.

7/17/2024 VVitori

1) This is a preliminary review. Do not resubmit until clearance sheet and approved site plan obtained. Turn in both clearance sheet and approved site plan with building permit application to Fire Permit Tech.

NOTE: Based on fire's site review, additional comments may be provided.

7/17/2024 VVitori

INFORMATIONAL ONLY NO RESPONSE NECESSARY:
The system(s) outlined in this set of plans is conceptual.

A HOLD has been placed at insulation inspection (109) until either: a) a permit has been pulled or b) a letter submitted from respective system contractor indicating no work to be done to the existing system:


- Fire Sprinkler System (D2.1 note 1; FP1.1 )
- Kitchen Hood (new hood and duct according to DM1.1 note 1 and 6, M1.1 note 3
- Kitchen Suppression System (new hood. M3.2)
-

7/16/2024 VVitori