Plan submitted for 18000sf modification to mixed use business assembly 3rd floor in an existing unknown construction type sprinklered structure . Reviewed as modification to business/assembly using FFPC 8th edition effective January 1, 2024. Review by the AHJ shall not relieve the applicant of the responsibility for compliance with the Code.

Reviewer: V.Vitori   
For questions regarding comments you may reach me at either: 904 209 1748 or vvitori@sjcfl.us.
To schedule fire inspections call 827 6842 (automated system).
Questions about inspections or resubmitting your plans call 209 1740x1.

 

RESUBMITTING:
A. Make necessary changes and resubmit everything in person to the permit center. You may not make handwritten alterations on signed and sealed plan pages.
B. Once at the Permit Center swap out altered pages or insert new pages in EACH plan set (Job and Office). One copy of the removed/old pages from the JOB Copy will need to be submitted and marked "OLD". Do not forget to remove pages for work not associated to this permit. All plan papers must be the same size.
C. Provide a response to comments along with any supporting documentation. Response to comments is REQUIRED not optional.
- The response to comments sheet will need to include a response to each numbered comment and tell us where in the plans the comments was addressed. EX - "Top Left of Page E1-1" or "Page E1 Note 8".
- Code responses shall reference Florida Fire Prevention Code, 8th Ed.

 

INFORMATIONAL ONLY NO RESPONSE NECESSARY:
The system(s) outlined in this set of plans is conceptual.

A HOLD has been placed at insulation inspection (109) until  a permit has been pulled :

- Fire Alarm System (E0.1)
- Fire Sprinkler System (FP page, several clouds and ceiling grid open above open offices shown on ID3.0 and ID3.2)

8/23/2024 VVitori

INFORMATIONAL ONLY NO RESPONSE NECESSARY:
At the time of fire final be prepared to provide a copy of the manufacturer specification sheets to the fire inspector showing that each interior finish will meet:

- wall and ceiling finish in exit and exit access corridors shall meet Class A or Class B. 101:38.3.3.2.1   101:12.3.3.2

- Wall and ceiling finish will meet Class A, B or C. 101:38.3.3.2.2   101:12.3.3.3

- floor finish in exit access corridors and spaces not separated from them shall meet class II. 101:12.3.3.5.2

- Floor finish shall meet either: a) ASTM D 2859 for carpet and carpet like materials or b) has a minimum critical radiant flux of .1 W/cm2 for non-carpet flooring. 101:38.3.3.3.3.

If there are multiple finishes, label each spec sheet identifying each product, its location AND highlight the area showing illustrating it meets the applicable Code requirement.

8/23/2024 VVitori

1) Looking at page ID0.2 shows construction type as "XXX". This does not correspond to anything in FFPC. Call out construction type to determine if an assembly can be located on the 3rd floor. 101:12.1.6

Thursday, August 22, 2024 Response to comment indicates "Construction Type has been updated in the Code Summary chart on sheet ID0.2".

It shows IIB. No assembly is permitted on the 3rd floor for this construction type.

 

2) Provide occupant load break down for each individual assembly room and make note on plans that it will need to be posted in accord with 101:12.7.9.3.

8/23/2024 VVitori