1.  Received plans to renovate and add additional space to a building built in 1988 and 1995. A search of our records indicate that building permits were not issued for these improvements. 

Please secure the services of an professional engineer to conduct a forensic inspection of the structure. The engineer is to provide  written recommendations to retrofit the structure to meet the requirements of the 2007 Florida Building Code.

9/9/2010 Jpaula

2. Please provide a complete code analysis including applicable code standards (2007 Florida Building Code-Building,  2007 Florida Building Code-Mechanical, 2007 Florida Building Code-Plumbing, 2007 Florida Building Code-Fuel Gas, and 2008 NEC), Occupancy group, Type of construction, Fire-resistant construction, Fire suppression, Life safety, Occupancy load/egress requirements, and Wind design date (1603.1.4).

NOTE: Sheet 5 references the residential code

9/7/2010 Jpaula

3.  Will X-ray equipment be used in this facility?

Please provide an x-ray shielding plan reviewed and approved by the Florida Bureau of Radiation. Please submit plans to Don Steiner Administrator Bureau of Radiation Control 705 Wells Road, Suite 300 Orange Park, Fl. 32073 Phone : (904) 278-5730 Fax: (904) 278-5737)  

9/7/2010 Jpaula

4.  Will medical gas be installed in this facility?

9/7/2010 Jpaula

5.  Please provide a domestic water and sanitary plumbing riser diagram.

Tuesday, September 07, 2010 Received one half of the building  plumbing sanitary riser diagram. Please provide the other half.
 
Tuesday, September 07, 2010 The domestic water riser diagram was not provided, plese provide.

Thursday, September 09, 2010 Approved with hold

9/9/2010 Jpaula

6. Please provide a high/low water fountain to comply with FBC-P Table 403.1 and FBC 11-4.13(10)a.

9/7/2010 Jpaula

7.  Please provide an electrical riser diagram and panel schedule.

9/7/2010 Jpaula

8.  Please provide a HVAC duct layout , including supply, return, exhaust, and makeup air. Include an equipment schedule showing makeup air complying to ASHRAE 62.1.


Tuesday, September 07, 2010  Received drawing in pencil, please overlay with ink.

9/9/2010 Jpaula

9.  Please revise the bathroom with the shower to meet handicapped accessibility to comply with FBC 11-4-2(6) and 11-4.21.

Tuesday, September 07, 2010 Item remains open:

Thursday, September 09, 2010 Removing fixtures per contractor

9/9/2010 Jpaula

10.  Please label each room use.

9/7/2010 Jpaula

11.  Please provide structural details for the new opening shown for doors and windows.

9/7/2010 Jpaula

12.  Received Energy form and equipment sizing for the proposed 288 s/f entry. Please provide a Energy form and equipment sizing for the entire building.

9/7/2010 Jpaula

13.  Please product approval for doors other than aluminum store front.

9/7/2010 Jpaula

14.  Please provide a typical wall section for the addition showing the foundation to the truss. Include all connections to meet FBC section 1609.