Please indicate which code cycle is being used. St. Johns County is currently enforcing the 2023 FBC and the 2020 NEC

5/30/2024 shillyard

The submitted drawing does not show that the restrooms are ADA compliant. Please provide dimensions of each toilet compartment and/or room.

5/30/2024 shillyard
General Notes: Your re-submittal shall include two complete sets of plans. Please insert the revised pages into the plan sets, and pages removed from the stamped "Job copy" set, shall be marked as "old set" and shall be included in the re-submittal.
If old "Job copy" drawings, are not resubmitted there will be additional plan review fee charged due to the amount of time necessary to review entire drawing again.
ALL ITEMS changed or revised on plans and documents shall be identified by circling, clouding or identified by some other legible method. ADDITIONAL ITEMS MAY BE REQUIRED - DEPENDING ON INFORMATION AND CLARITY OF FINAL PLANS SUBMITTED FOR REVIEW.
5/30/2024 shillyard
Provide a complete clearance sheet and two DRC approved site plan. 5/7/2024 shillyard

*new comment 05.07.2024*

There is no indication of urinal screens being installed. These are required per the FBC 1210.3.2.

5/30/2024 shillyard

*new comment 05.07.2024*

Please indicate on drawing the direction the doors into the ADA stalls will swing. Include proposed door size.

5/30/2024 shillyard

*new comment 05.07.2024*

There appears to be a lavatory in the ADA stalls. These fall in the require clearance per FBC Accessibility 604.3-604.3.2.  Please clarify

5/30/2024 shillyard

*new comment 05.07.2024*

Please provide an existing floor plan for both the restroom and bar area.

5/30/2024 shillyard

*new comment 05.07.2024*

Please provide a drawing of the bar area and proposed new work.

5/30/2024 shillyard