10702764-125
| BL FNL |
9/4/2007
|
9/5/2007
| A |
-passed 09/04/07 MD
|
40702503-403
| MC FNL |
8/2/2007
|
8/3/2007
| A |
-passed 8/3/07 MD
|
40702294-403
| MC FNL |
8/2/2007
|
8/3/2007
| A |
-passed 8/3/07 MD
|
30701585-304
| PL FNL |
8/2/2007
|
8/3/2007
| A |
TESH, MORRIS-passed 08/03/07 MD
|
20702123-204
| EL FNL |
8/2/2007
|
8/6/2007
| A |
-passed 8/4/07 WJ
|
10702764-000
| INFO.. |
7/19/2007
|
7/24/2007
| A |
-inspection scheduled to prompt re-visit by SJC inspector to verify correction to deficiency found on Energize Building inspection WJ
|
20702123-212
| ENERGZ |
7/17/2007
|
7/16/2007
| A |
-passed 7/16/07 WJ
|
10702764-131
| WINDOW |
7/11/2007
|
7/11/2007
| A |
-7/11/07 WJ
|
10702764-105
| FRAMNG |
6/27/2007
|
6/27/2007
| A |
-Passed 06/27/07 MD
|
10702764-102
| SLAB.. |
6/27/2007
|
6/27/2007
| A |
-passed 06/27/07 MD
|
40702503-401
| MC RGH |
6/27/2007
|
6/27/2007
| A |
-passed 06/27/07 MD
|
10702764-110
| FIRE W |
6/12/2007
|
6/13/2007
| A |
-passed dry wall screw off and fire wall 6/12/07 MD
|
10702764-119
| P INSU |
6/6/2007
|
6/7/2007
| A |
-passed 06/06/07 MD
|
40702503-401
| MC RGH |
6/5/2007
|
6/5/2007
| D |
-6/5/07 mech rough not complete, need 3 hour dampers in place at time of inspection; mech code calls for 3hr dampers code section 716.3.1 WJ
|
40702294-401
| MC RGH |
6/5/2007
|
6/5/2007
| A |
-passed 6/5/07 WJ
|
30701585-302
| TOPOUT |
6/5/2007
|
6/5/2007
| A |
TESH, MORRIS-passed 06/04/07 MD
|
10702764-115
| P FRMG |
6/5/2007
|
6/5/2007
| A |
-partions only
|
10702764-111
| P FNDT |
6/5/2007
|
6/5/2007
| A |
-passed 06/04/07
|
10702764-111
| P FNDT |
6/4/2007
|
6/4/2007
| D |
-cancel inspection, will perform 6/5/07 because contractor will have additional inspections called in at same time WJ
|
20702123-203
| RGH EL |
6/4/2007
|
6/4/2007
| A |
-passed 6/4/07 WJ
|
10702764-113
| P LNTL |
5/24/2007
|
5/25/2007
| A |
-passed 05/24/07 MD
|
10702764-101
| FND/FT |
5/24/2007
|
5/25/2007
| C |
-Cancel-not ready MD
|
10702764-103
| LINTEL |
5/17/2007
|
5/18/2007
| A |
-passed 05/17/07
|