8TH EDITION FBC (2023)
| |
| |
EARLY POWER LETTER REC'D
| |
7/23/2025 1:13:54 PM
| clschmermund |
ENERGIZE BLDG INSPECTION
| |
7/23/2025 2:46:20 PM
| air |
HOLD 109 INSP FOR EXHST HD PRMT
| REVISION SHEET M002 |
3/27/2025 10:36:33 AM
| lnewton |
HOLD 109 INSP FOR FIRE ALRM PRMT
| SHEET E401, ALSO; HOOD SUPPRESSION CONNECTION (M002) |
2/28/2025 11:30:34 AM
| lnewton |
HOLD 109 INSP FOR FIRE SPRNKLR PRMT
| FP001, HVLS FANS [A301] |
12/23/2024 3:15:49 PM
| dlyons |
HOLD 109 INSP FOR UNDERGROUND PERMIT
| |
12/12/2024 10:34:54 AM
| lnewton |
HOLD BLDG FINAL INSP FOR FIRE MARSHAL FINAL.
| |
9/11/2025 2:46:59 PM
| air |
HOLD C/O FOR SITE ASBUILT APPROV
| OK FOR TCO THRU 10/13/25 PER BP |
| |
IMPACT FEE DUE
| 25-010399 |
2/25/2025 3:48:57 PM
| dwint |
INFO NOC-
| 6029;278 |
12/3/2024 2:19:42 PM
| bbonfanti |
LANDSCAPE INSPECTION REQ
| LANDSCAPE WILL BE INSPECTED AT TIME OF ASBULT |
9/8/2025 7:05:55 AM
| jdegennaro |
PAID UTILITY RECEIPT REQUIRED
| SJCUD |
8/20/2025 2:54:29 PM
| krobshaw |
REINSPECTION FEE
| 62500167 606 9/8/2025 $55 |
9/10/2025 6:47:11 AM
| lnewton |
REINSPECTION FEE
| 42505648 636 6/2/2025 $55 |
7/15/2025 12:05:01 PM
| lnewton |
TERMITE BOND CO
| PROTEK; SOIL |
7/23/2025 4:21:43 PM
| krobshaw |
TERMITE PROTECTION CERT OF COMPL
| |
8/20/2025 2:56:36 PM
| krobshaw |
HOLD C/O FOR SEPARATE TPO ROOF PERMIT
| |
8/26/2025 1:16:32 PM
| mwerkheiser |
HOLD 604/624 - ABOVEGROUND HYDRO TO ADDRESS REVIEW CMMT #4
| |
5/1/2025 7:56:09 AM
| dfeagle |
HOLD 105 INSP - REVISION - SLOPED FLOOR/TRENCH DRAIN
| MAIN DRIVE AREA OF SERVICE BAY: CMMT #18 |
8/26/2025 1:43:05 PM
| dfeagle |
HOLD 105 INSP - REVISION - ABOVEGROND TANKS
| SEE REVIEW CMMNT #14 |
8/26/2025 1:43:06 PM