7th Edition FBC (2020)
| |
| |
BAY WIND/FPLACE/EAVES/MAX 3 FT. PROJECTION
| |
| |
EARLY POWER LETTER REC'D
| |
9/6/2022 1:15:13 PM
| slkling |
FEMA FORM REQUIRED
| FZ - AE BFE - 7' FFE - 9.1 EQUIP. - 8.7' |
5/15/2022 12:14:50 PM
| wwoodward |
HOLD C/O FOR SUBDIVISION ASBUILT APPROVAL
| |
11/15/2022 11:28:33 AM
| dwintons |
HOLD C/O: ORIGINAL FINISHED CONST FEMA
| BFE-7' MER-8' FFE-9.1' GAR-8.2' EQUIP-8.7' |
11/7/2022 7:59:33 AM
| ajordan |
IMPACT FEE DUE
| 22-043308 |
6/28/2022 11:27:01 AM
| Lexis |
INFO NOC-
| 5474/1357 |
2/28/2022 10:43:12 AM
| ccontestabile |
LANDSCAPE INSPECTION REQ
| |
10/28/2022 11:07:22 AM
| |
METER CAN INSPECTION
| |
9/6/2022 9:33:40 AM
| air |
PAID UTILITY RECEIPT REQUIRED
| SJCUD |
3/15/2022 3:37:10 PM
| slkling |
SEPTIC TANK FINAL REQ
| |
11/3/2022 12:08:12 PM
| ehealth |
SOLID WASTE FEE DUE
| ANNUAL ASSESSMENT $890.00 |
2/28/2022 9:28:12 AM
| ccontestabile |
SWALE/CULVERT FINAL INSP REQ
| |
11/14/2022 10:14:39 AM
| air |
TERMITE BOND CO
| TURNER; BAIT |
2/28/2022 9:26:32 AM
| ccontestabile |
TERMITE PROTECTION CERT OF COMPL
| |
10/31/2022 9:26:34 AM
| slkling |