8TH EDITION FBC (2023)
| |
| |
|
ENERGIZE BLDG INSPECTION
| |
| |
|
HOLD 109 INSP FOR FIRE ALRM PRMT
| |
| |
|
HOLD 109 INSP FOR FIRE SPRNKLR PRMT
| |
| |
|
HOLD 109 INSP FOR UNDERGROUND PERMIT
| |
8/3/2026 8:52:14 AM
| lnewton |
|
HOLD BLDG FINAL INSP FOR FIRE MARSHAL FINAL.
| |
| |
|
HOLD C/O FOR SITE ASBUILT APPROV
| |
| |
|
IMPACT FEE DUE
| |
| |
|
INFO NOC-
| BK: 6403 PG: 848 |
7/21/2026 7:47:26 AM
| bmsmith |
|
LANDSCAPE INSPECTION REQ
| TO BE CAPTURED AT TIME OF ASBUILT |
| |
|
PAID UTILITY RECEIPT REQUIRED
| SJCUD |
| |
|
TERMITE BOND CO
| PROTECH; SOIL |
7/14/2026 1:32:21 PM
| bmsmith |
|
TERMITE PROTECTION CERT OF COMPL
| |
| |
|
HOLD FINAL FOR SEPERATE ROOF PERMIT
| TPO |
| |
|
HOLD CO FOR THRESHHOLD REPORT
| |
| |
|
HOLD 105 FOR FIRE/SMOKE DAMPER INSPECTIONS
| |
| |
|
HOLD 105 FOR BDA SYSTEM TEST
| |
| |
|
HOLD 105 FOR REVISION FOR COMMENTS 16, 21, 35, 36, 40, 45,
| 46, 48, 49, AND 53 BY DIRECTION OF FM DOWLING. |
| |