SJC Home
DescriptionInputDateWho
7th Edition FBC (2020)    
EARLY POWER LETTER REC'D   3/18/2024 9:03:35 AM ecannon
EARLY POWER LETTER REC'D 22311041 3/20/2024 10:16:13 AM ecannon
ENERGIZE BLDG INSPECTION   3/20/2024 9:50:48 AM air
HOLD 109 INSP FOR EXHST HD PRMT   11/9/2023 3:33:23 PM lnewton
HOLD 109 INSP FOR FIRE ALRM PRMT CHECK COMMENTS FOR ALARM REFERENCES 8/7/2023 1:06:51 PM dlyons
HOLD 109 INSP FOR FIRE SPRNKLR PRMT   8/7/2023 1:06:49 PM dlyons
HOLD 109 INSP FOR FIRE SUP PRMT   5/28/2024 9:16:26 AM dlyons
HOLD 109 INSP FOR UNDERGROUND PERMIT   6/15/2023 1:12:54 PM PWebb
HOLD BLDG FINAL INSP FOR FIRE MARSHAL FINAL.   9/11/2024 1:24:10 PM air
HOLD C/O FOR SITE ASBUILT APPROV OK FOR TCO PER B.POWELSON THRU 10/14  
IMPACT FEE DUE 22-011216 2/18/2022 12:15:54 PM dwint
INFO NOC- BK 5489 PG 1431 2/10/2022 9:53:02 AM slkling
LANDSCAPE INSPECTION REQ LANDSCAPE WILL BE CAPTURED AT TIME OF ASBULT 9/16/2024 7:36:09 AM jdegennaro
PAID UTILITY RECEIPT REQUIRED JEA 9/12/2024 12:27:47 PM ahart
REINSPECTION FEE 24-016312 3/15/2024 10:11:47 AM tclif
REINSPECTION FEE 24-016312 3/15/2024 10:11:47 AM tclif
REINSPECTION FEE 24-016312 3/15/2024 10:11:47 AM tclif
REINSPECTION FEE 24-016312 3/15/2024 10:11:47 AM tclif
REINSPECTION FEE 24-038958 6/21/2024 12:06:43 PM tclif
REINSPECTION FEE 24-038958 6/21/2024 12:06:43 PM tclif
REINSPECTION FEE 24-038958 6/21/2024 12:06:43 PM tclif
TERMITE BOND CO FLORIDA PEST / SOIL 9/19/2023 11:58:26 AM krobshaw
TERMITE PROTECTION CERT OF COMPL   6/28/2024 1:38:58 PM clschmermund
HOLD 102 SLAB INSPECTION TRUSS PACKAGAE   1/19/2023 12:04:01 PM jadams
HOLD C/O TILE ROOF PERMIT   7/26/2023 3:30:17 PM jcrodriguez
HOLD 105 FOR FP ENGINEER EVALUATION FOR WINDOW SPRINKLERS. APPROVED BY DAN F. 1/5/2024 10:35:12 AM dlyons
HOLD 109 FOR FIRE/SMOKE DAMPER INSPECTIONS COMPLETED INSPECTIONS- LETTER RECIEVED 6/20/2024 9:42:00 AM jlhatcher
HOLD 109 FOR FIRE PUMP PERMIT   3/17/2023 8:08:02 AM dfeagle
HOLD 109 FOR LOCKING ARRANGEMENT PERMIT   10/23/2023 1:31:27 PM dlyons
HOLD 109 FOR LIFE SAFETY GENERATOR PERMIT GENERATOR - SEE CLERANCE SHEET C20-7158*1 9/7/2023 9:54:35 AM dfeagle
HOLD 105 FOR RADIO ENHANCEMENT SYSTEM BDA PERMIT ISSUED 6/5/2024 2:39:51 PM dlyons
HOLD FIRE FINAL APPROVAL FOR BDA POST TEST REPORT RECEIVED PASSING BDA POST TEST REPORT 7/2/2024 12:44:41 PM dlyons