Clearance Sheet R2010-000810

Clearance Sheet is Over 180 Days

Contractor: FORREST, CHRISTOPHER LEE
Unpaid $0.00(); Paid $3,815.00(0572348)
Cert Occ
Proj Name: Parcel:
Prop Use Desc: Prop Use:
Contractor ID: Valuation:

Pre:      Street Num:      Street:      Class:      Post:      Zip  Supplemental:   


Expedited Review Required:   

Permit #Issue DateInfoContractorPaidDueAssocInfo
21002404 8/26/2010 2:53:03 PMTGFPL4.03 KELLY, JAMES FREDRICK00[ MAIN SERVICE PANEL Amps 500 - TEMPORARY POLE 1 - ]
31001964 11/12/2010 11:01:44 AM MCLENDON, TIMOTHY WAYNE00[ NEW CONSTRUCTION 44 - ]
41102759 7/8/2011 1:26:00 PMA CHAPMAN, STEPHEN RANDALL00[ NEW HVAC Valuation 107645 - ]
41105078 12/20/2011 10:54:13 AMG FLOWERS JR., DEWEY LAMAR00[ GAS PIPING Outlets 8 - (3) GAS WATER HEATER 1 - ]
81200851 8/7/2012 4:03:08 PM FUTCH, DARYLL00[ SPRINKLER HEADS Units 35 - ]
11004206 8/25/2010 3:11:42 PM101FORREST, CHRISTOPHER LEE00 
11202865 5/18/2012 3:40:42 PM435RINNERT, BRET00 


Log

TypeRcv DtPln Rvwd DtRvwdByStatusCommentOutstanding CommentsPlan Review
BLDG PLAN REVIEWER8/9/2010 ecannon8/13/2010 JPAULAjpaulaRejected 14 Plan Review
BLDG RESUBMIT8/23/2010 cmanucy8/25/2010 jpaulajpaulaApproved 0 Plan Review
PENDING PERMIT ISSUES8/30/2010 ktaing8/31/2010 tcarrolljpaulaPending Augercast Pile Spacing clarification 1 Plan Review
PENDING PERMIT ISSUES9/2/2010 ecannon9/10/2010 JpaulajpaulaApproved HOLD ON PILING INSTALLATION INSPECTION REPORT 0 Plan Review
PENDING PERMIT ISSUES9/28/2010 khart9/28/2010 JPAULAjpaulaRejected 1 Plan Review
BLDG REVISION10/4/2010 cmanucy10/6/2010 jdacostaclohmanApproved FOUNDATION CLARIFICATIONS 0 Plan Review
PENDING PERMIT ISSUES10/26/2010 abutler10/28/2010 jpaulajpaulaRejected hollow core slab shop drawings and engineers statement delegating shoring responsibility to the contractor 1 Plan Review
PENDING PERMIT ISSUES10/26/2010 jpaula10/28/2010 jpaulajpaulaRejected Shoring and reshoring 1 Plan Review
BLDG RESUBMIT12/2/2010 cmanucy12/6/2010 jpaulajpaulaApproved RESUB OF REJECTED REVISION. (SHORING) 0 Plan Review
BLDG REVISION12/2/2010 cmanucy12/6/2010 jpaulajpaulaRejected STEEL SHOP 1 Plan Review
BLDG REVISION12/13/2010 ktaing12/14/2010 jpaulajpaulaApproved Steel shop drawings to release hold 0 Plan Review
BLDG REVISION3/4/2011 ecannon3/7/2011 jpaulajpaulaApproved Alternate circular arched 8" CMU Lintel Beam 0 Plan Review
BLDG REVISION4/8/2011 ecannon4/12/2011 jpaulajpaulaApproved Revisingcolumns from concrete to CMU 0 Plan Review
PENDING PERMIT ISSUES3/27/2012 ccontestabile4/4/2012 jpaulajpaulaApproved Energy form 0 Plan Review
BLDG REVISION9/7/2012 ABUTLER9/19/2012 JPAULAjpaulaRejected REVISED 1ST FLOOR PLAN AS REQUESTED BY BUBBA 1 Plan Review
BLDG REVISION9/7/2012 ABUTLER9/19/2012 JPAULAjpaulaRejected ENERGY SHEETS AS REQUESTED BY CHARLES 2 Plan Review
BLDG REVISION9/26/2012 cgalloway9/27/2012 jpaulajpaulaApproved Resubmit of the revised first floor receptacle placement 0 Plan Review
BLDG REVISION9/26/2012 cgalloway9/27/2012 jpaulajpaulaApproved RESUB OF ENERGY CALC REVISION 1 Plan Review
PENDING PERMIT ISSUES12/6/2012 edegrande12/6/2012 jpaulajpaulaApproved 3 holds to release Air distribution leakage test and envelope test only JP 0 Plan Review
BLDG RESUBMIT12/7/2012 JPAULA12/7/2012 JPAULAjpaulaApproved Revised energy form, removed requirement for factory-sealed air handler 0 Plan Review


Notes

Note DtNote
9/20/2012 ccontestabile

rejected revision in drawer.

9/20/2012 ccontestabile

rejected revision for energy calcs in drawer.

4/12/2011 ecannon

APPROVED REVISED PLAN PUT IN DRAWER

3/7/2011 ecannon

APPROVED REVISED PLAN PUT IN DRAWER

12/14/2010 ecannon

APPROVED REVISED PLANS PUT IN DRAWER

12/7/2010 ecannon

DISAPPROVED REVISED PLAN PUT IN DRAWER

12/7/2010 ecannon

APPROVED REVISED PLAN FOR RESHORING, CORE SLAB & STATEMENT DELEGATING SHORING PUT IN DRAWER

10/29/2010 cmanucy

rejected revision in drawer.

10/6/2010 ecannon

APPROVED REVISED PLAN PUT IN DRAWER

9/29/2010 ecannon

DISAPPROVED REVISED PLANS PUT IN DRAWER

9/10/2010 ecannon

APPROVED REVISED PILING REPORT PLAN PUT IN DRAWER

9/9/2010 ecannon

DISAPPROVED REVISED LETTERS PUT IN DRAWER

8/23/2010 abutler

created permit so JNP could scan pertinant documents into file and for other tracking DEP purposes. do not issue permit; not completed as of 8/23/10

8/20/2010 cmanucy

MR FORREST CHECKED OUT REJECTED PACKAGE