Clearance Sheet R2022-008613*002

 Department IssuesSigned OffIntl

1. The plans submitted are designed to the FBC Res. 2020. The current code cycle is the FBC 2023 8th Edition and the NEC 2020.

The Florida building code Residential for wind loads is only used for wind up to 115mph.

--- Please provide design manual references for winds above 115mph

--- Please review and update the code cycle to the Florida Building Code 2023 8th 

--- The NEC is currently correct NEC 2020 

7/9/2024 janoda

2. Please provide the floor truss engineering designs sealed by the truss designer and reviewed by the architect of record.

7/9/2024 janoda

3. The plan shows a 2x6 for valley rafters in the detail, however I do not see dimensions for the common rafter or the ridge beam.

---Please provide the common rafter and ridge dimensions.  

7/9/2024 janoda

4. Sheet S3.1 has a table and a statement which is out of date using the 2004 FBC and the ASCE 7-05.

--- Please update this to the current 130mph wind code FBC 2023 and ASCE 7-22 

7/9/2024 janoda

5. The Flat roof and deck area does not appear to have any drainage design.

--- Please provide a drainage plan per FBCR R905.11.1 and R903.4

7/9/2024 janoda

6. The plan and energy sheets indicate a metal roof the product approval has shingles and bitumen.

---Please provide the metal roof product approval number or update the plan and energy sheet to the correct roof product.

7/9/2024 janoda
Pen and ink changes, white-outs, or any such altering of raised seal engineering drawings, is not permitted under state laws governing the practice of Architecture or Engineering. All information on the raised seal drawings must part of the printed sheets at the time the drawings are sealed by the Architect/Engineer. 7/9/2024 janoda
General Notes: Your re-submittal shall include two complete sets of plans. Please insert the revised pages into the plan sets, and pages removed from the stamped "Job copy" set, shall be marked as "old set" and shall be included in the re-submittal.
If old "Job copy" drawings, are not resubmitted there will be additional plan review fee charged due to the amount of time necessary to review entire drawing again.
ALL ITEMS changed or revised on plans and documents shall be identified by circling, clouding or identified by some other legible method. ADDITIONAL ITEMS MAY BE REQUIRED - DEPENDING ON INFORMATION AND CLARITY OF FINAL PLANS SUBMITTED FOR REVIEW.
7/9/2024 janoda