SJC Home
Clearance Sheet R2022-002857

 Department IssuesSigned OffIntl

1. Please verify Exposure Category on Structural drawing indicating a C exposure when it appears to be located in a D exposure on the beach. RECEIVED 6/7/22

6/8/2022 bLester

2. Please provide the V-Zone certificate from the Engineer of Record. RECEIVED 6/7/22

http://www.sjcfl.us/BuildingServices/media/forms/VZoneCertificate.pdf

6/8/2022 bLester

R310.1Emergency escape and rescue opening required.

Basements, habitable attics and every sleeping room shall have not less than one operable emergency escape and rescue opening. Where basements contain one or more sleeping rooms, an emergency escape and rescue opening shall be required in each sleeping room. Emergency escape and rescue openings shall open directly into a public way, or to a yard or court that opens to a public way.

6/10/2022 bLester

Emergency and escape rescue openings shall have a net clear opening of not less than 5.7 square feet (0.530 m2). The net clear opening dimensions required by this section shall be obtained by the normal operation of the emergency escape and rescue opening from the inside. The net clear height opening shall be not less than 24 inches (610 mm) and the net clear width shall be not less than 20 inches (508 mm).

Exception: Grade floor or below grade openings shall have a net clear opening of not less than 5 square feet (0.465 m2). SECOND FLOOR SUITES? CONTRACTOR CALLED AND CLARIFIED WINDOWS ARE CASEMENT IN SUITE 3 AND 2

6/10/2022 bLester