R318.7Inspection for termites.
In order to provide for inspection for termite infestation, clearance between exterior wall coverings and final earth grade on the exterior of a building shall not be less than 6 inches (152 mm).
Exceptions:
-
l.Paint or decorative cementitious finish less than 5/8 inch (17.1 mm) thick adhered directly to the masonry foundation sidewall.
-
2.Access or vehicle ramps which rise to the interior finish floor elevation for the width of such ramps only.
-
3.A 4-inch (102 mm) inspection space above patio and garage slabs and entry areas.
-
4.If the patio has been soil treated for termites, the finish elevation may match the building interior finish floor elevations on masonry construction only.
-
5.Masonry veneers constructed in accordance with Section R318.4. PLEASE ADD THIS TO YOUR DETAIL ,
|
| |
|
|
PLEASE PROVIDE DETAILS THAT COINCIDE ONE CALLS FOR 2X6 FRAMING AND THE OTHER HAS A 2X4 SILL PLATE , ALL THREAD AND ZIP SYSTEM ARE TO BE USE IN CONJUNCTION WITH STRAPPING,AND TITAN BOLTS ? NEED CLEARIFICATION ON HOW YOU PLAN TO BUILD WALLS
|
| |