| | Department Issues | Signed Off | Intl |
|
|
The Engineer of Record is required to review and approve the work of the delegated truss design engineer prior to submittal for permitting. Provide truss engineering showing approval of the EOR. NEED TRUSS LAY OUT COPIES, TOPCORD DEAD LOAD IN STRUCTUAL DESIGN PLAN NEED TO MATCH WITH DESIGNED TRUSSES.
|
| |
|
|
SEPTIC TANK PERMIT ,SITE AND FLOOR PLANS
|
| |