| | Department Issues | Signed Off | Intl |
|
|
The Engineer of Record is required to review and approve the work of the delegated truss design engineer prior to submittal for permitting. Provide truss engineering showing approval of the EOR. NEED COPIES OF TRUSS LAY OUT , TOP CORD DEAD LOAD ON STRUCTUAL PLANS NEED TO MATCH TRUSS ENGINEERING.
|
| |
|
|
NEED SEPTIC PERMIT ,SITE PLAN AND FLOOR PLAN.
|
| |