SJC Home
Clearance Sheet R2021-006240*002

 Department IssuesSigned OffIntl

Please submit two sets of construction documents to be reviewed.

 

completed 11/28/23

11/28/2023 tfitz
Please indicate on the build plan that type x 5/8" drywall will used on the garage ceiling as per the attached code.   Completed 11/28/23
 

R302.6Dwelling-garage fire separation.

The garage shall be separated as required by Table R302.6. Openings in garage walls shall comply with Section R302.5. Attachment of gypsum board shall comply with Table R702.3.5. The wall separation provisions of Table R302.6 shall not apply to garage walls that are perpendicular to the adjacent dwelling unit wall.

TABLE R302.6

DWELLING-GARAGE SEPARATION

SEPARATION MATERIAL
From the residence and attics Not less than 1/2-inch gypsum board or equivalent applied to thegarage side
From habitable rooms above the garage Not less than 5/8-inch Type X gypsum board or equivalent
Structure(s) supporting floor/ceiling assemblies used for separationrequired by this section Not less than 1/2-inch gypsum board or equivalent
Garages located less than 3 feet from a dwelling unit on the same lot Not less than 1/2-inch gypsum board or equivalent applied to the interiorside of exterior walls that are within this area

For SI: 1 inch = 25.4 mm, 1 foot = 304.8 mm.

11/28/2023 tfitz

Egress from habitable spaces through a garage is prohibited as per the attached code.

 

R311.1Means of egress.

Dwellings shall be provided with a means of egress in accordance with this section. The means of egress shall provide a continuous and unobstructed path of vertical and horizontal egress travel from all portions of the dwelling to the required egress door without requiring travel through a garage. The required egress door shall open directly into a public way or to a yard or court that opens to a public way.

 

Completed 11/28/23

11/28/2023 tfitz

Please provide energy calculations for this project.

Completed 11/28/23

11/28/2023 tfitz

Please state on the plans the design criteria including code cycle being used to design this project.

 

Unsatisfied on most recent submittal submittal

12/5/2023 tfitz