1. The detached garage requires a separate Clearance Sheet, approved site-plan and building permit.
|
2/15/2022
| jdacosta |
|
|
2. There appears an interior bearing footer may be missing. Please review the interior wall location which bears Floor Truss F03 and the second floor and roof load for an interior bearing footer.
|
2/15/2022
| jdacosta |
|
|
3. The Florida Energy Form is designed for an composite asphalt shingle roof whereas the drawings indicate a flat concrete roof cover. Please revise.
|
2/15/2022
| jdacosta |
|
|
General Notes: Your re-submittal shall include two complete sets of plans. Please insert the revised pages into the plan sets, and pages removed from the stamped "Job copy" set, shall be marked as "old set" and shall be included in the re-submittal. If old "Job copy" drawings, are not resubmitted there will be additional plan review fee charged due to the amount of time necessary to review entire drawing again. ALL ITEMS changed or revised on plans and documents shall be identified by circling, clouding or identified by some other legible method. ADDITIONAL ITEMS MAY BE REQUIRED - DEPENDING ON INFORMATION AND CLARITY OF FINAL PLANS SUBMITTED FOR REVIEW.
|
2/15/2022
| jdacosta |
|
|
Pen and ink changes, white-outs, or any such altering of raised seal engineering drawings, is not permitted under state laws governing the practice of Architecture or Engineering. All information on the raised seal drawings must part of the printed sheets at the time the drawings are sealed by the Architect/Engineer.
|
2/15/2022