Clearance Sheet R2021-001510

 Department IssuesSigned OffIntl

Under Construction Elevation Certificate

This submission has been approved. Please address the following comments on Finished Construction EC for C/O:

1) A7 should be diagram 5 (structure elevated on piles)

2) C2 c) should be measured from the concrete beam just below the slab, not from the below-grade footing (per plan S-4 section 8)

3) All equipment/ machinery servicing the building should be elevated to at least 14' or higher when placed

Please contact Westly Woodward with any questions at wwoodward@sjcfl.us or 904-209-0627.