1. Please provide 2 copies of the truss design criteria reviewed by the engineer of record

7/12/2021 janoda

2. Please provide manual D for the energy sheets

7/12/2021 janoda

3. It appears there is a deck on the seaward side of the building which states post supported deck. There are not any design criteria for the deck therefore I am assuming it will be unattached and a separate permit.

 

Separate permit per contractor 

9/30/2021 janoda

4. Please provide 2 copies of the ICC_ES Report for the foam insulation being used.

7/12/2021 janoda

5. It appears the Architectural drawings are drawn by an architect claiming copy rights. If this so then the Architect must sign and seal all prepared documents. 

Each registered architect shall obtain one seal in a form approved by rule of the board and may, in addition, register her or his seal electronically in accordance with ss. 668.001-668.006. All final construction documents and instruments of service which include drawings, plans, specifications, or reports prepared or issued by the registered architect and being filed for public record shall bear the signature and seal of the registered architect who prepared or approved the document and the date on which they were sealed 

7/12/2021 janoda

6. Please provide Affidavit to Acknowledge the Requirement for a Pile Installation
Inspection Report
 completed by the Contractor prior to the permit being issued. This form may be found on the county website under building services, applications and forms

7/12/2021 janoda

7. Please provide a cross section detail demonstrating all structural members and required elevations from the foundation to the roof deck.  

7/12/2021 janoda

A Health Department approved site plan and floor showing all floors are required prior to permitting

9/30/2021 janoda