SJC Home
Clearance Sheet R2017-001284*001

 Department IssuesSigned OffIntl

1. It appears the master bedroom does not comply with R310.1 FBCR

---Please provide Emergency Escape opening for the master bedroom

 

2. Please provide the ICC_ES report for the spray foam insulation being used.

 

3. V Zone Certificate Required from Engineer Of Record http://www.sjcfl.us/BuildingServices/media/forms/VZoneCertificate.pdf

 

4. Pile Report Required before permitting http://www.sjcfl.us/BuildingServices/media/forms/AffidavitAcknowledgerequirementforpileinstalltion.pdf

 

5. An Approved Site Plan and Floor Required from Health Dept.