Clearance Sheet R2015-003315

 Department IssuesSigned OffIntl

1. The Code Analysis indicates "Partially Enclosed" internal pressures (-.55+.55) whereas the truss engineering is enclosed. Please correlate.

9/24/2015 jdacosta

2. Submit the current Florida Energy Form (form 405-14) also please provide individual forms for each structure.

9/24/2015 jdacosta

3. Please identify all habitable spaces of the Guest House.  

9/24/2015 jdacosta

4. Please identify all interior bearing footers with the required reinforcing steel.

9/24/2015 jdacosta

5. Please identify all exterior and interior headers also identify all supporting king and jack studs.

9/24/2015 jdacosta

6. The on/center spacing of all-thread rods are listed at 4 foot on center. Please identify the uplift at doors and windows wider than 4 foot.

10/1/2015 jdacosta

7. Please submit dormer framing detail with all uplift connections shown. 

ADDED ON 09/24/2015; ITEM NOT ADDRESSED. PLEASE INCLUDE THE BALLOON FRAMED GABLE END WALL IN GREAT ROOM. 

10/1/2015 jdacosta

8. The E.O.R. is required to review, approve, sign and date the delegated roof truss engineering.

9/24/2015 jdacosta

9. Please provide a detail of roof and window flashing at Bedroom #4 3050 window located below roof line.

9/24/2015 jdacosta

10. Please refer to FBC-R 2014 Table 1001.1 for chimney clearances. The chimney doesn't appear to meet the 2 foot by 10 foot rule.

9/24/2015 jdacosta

11. Please identify the post/column supports under each multi-ply girder.

9/24/2015 jdacosta

12. Please identify all shear-wall sections and the required uplift connections and each end of each section.

ADDED ON 09/24/2015; ITEM NOT ADDRESSED.

10/1/2015 jdacosta

13. Please provide a ledger detail for all porch conventional roof and ceiling rafter connections to the house.

ADDED ON 09/24/2015; ITEM NOT ADDRESSED. 

10/1/2015 jdacosta

14. Please provide the multi-ply beam fastening schedule.

9/24/2015 jdacosta

15. Please submit the ICC ES Report for the spray foam insulation being used.

ADDED ON 09/24/2015; FORM EXPIRED. PLEASE SUBMIT CURRENT FORM.

10/1/2015 jdacosta

16. Please identify Guest House porch rafter connection to main structure.

ADDED ON 09/24/2015; ITEM NOT ADDRESSED. PLEASE IDENTIFY IF CONNECTED TO A LEDGER OR LET IN ABOVE TOP PLATE ALONG SIDE ROOF TRUSS. 

10/1/2015 jdacosta
17. An additional fee due and payable at permitting shall be of $100 each for any second resubmission of plans. Per FL. Statute 553.80(2)(b), on any third and subsequent resubmissions that do not correct a code violation that is specifically and continuously noted in each previous rejection, a fee of four times the amount of the fee attributed to plan review will be charged. 10/1/2015 jdacosta
18. General Notes: Your re-submittal shall include two complete sets of plans. Please insert the revised pages into the plan sets, and pages removed from the stamped "Job copy" set, shall be marked as "old set" and shall be included in the re-submittal.
If old "Job copy" drawings, are not resubmitted there will be additional plan review fee charged due to the amount of time necessary to review entire drawing again.
ALL ITEMS changed or revised on plans and documents shall be identified by circling, clouding or identified by some other legible method. ADDITIONAL ITEMS MAY BE REQUIRED - DEPENDING ON INFORMATION AND CLARITY OF FINAL PLANS SUBMITTED FOR REVIEW.
10/1/2015 jdacosta
19. Pen and ink changes, white-outs, or any such altering of raised seal engineering drawings, is not permitted under state laws governing the practice of Architecture or Engineering. All information on the raised seal drawings must part of the printed sheets at the time the drawings are sealed by the Architect/Engineer. 10/1/2015 jdacosta