SJC Home
Clearance Sheet R2015-001903

 Department IssuesSigned OffIntl

1 The truss layout does not appear to match the structure and foundation. Please review and revise all drawings affected by revision.

8/27/2015 jdacosta

2. The Florida Energy Form does not appear to be for this project. Also it is not for the current code cycle. Please submit the current form with corrected information, Sq. Ft., address, jurisdiction.

8/27/2015 jdacosta

3. The Product Approval form appears to be incomplete, please provide the FL numbers for all items listed on form.

8/27/2015 jdacosta

4. The windows listed on Energy Form appear to be Vinyl whereas the Product Approval form indicates Aluminum. Please correlate.

8/27/2015 jdacosta
5. An additional fee due and payable at permitting shall be of $100 each for any second resubmission of plans. Per FL. Statute 553.80(2)(b), on any third and subsequent resubmissions that do not correct a code violation that is specifically and continuously noted in each previous rejection, a fee of four times the amount of the fee attributed to plan review will be charged. 8/27/2015 jdacosta
6. General Notes: Your re-submittal shall include two complete sets of plans. Please insert the revised pages into the plan sets, and pages removed from the stamped "Job copy" set, shall be marked as "old set" and shall be included in the re-submittal.
If old "Job copy" drawings, are not resubmitted there will be additional plan review fee charged due to the amount of time necessary to review entire drawing again.
ALL ITEMS changed or revised on plans and documents shall be identified by circling, clouding or identified by some other legible method. ADDITIONAL ITEMS MAY BE REQUIRED - DEPENDING ON INFORMATION AND CLARITY OF FINAL PLANS SUBMITTED FOR REVIEW.
8/27/2015 jdacosta
7. Pen and ink changes, white-outs, or any such altering of raised seal engineering drawings, is not permitted under state laws governing the practice of Architecture or Engineering. All information on the raised seal drawings must part of the printed sheets at the time the drawings are sealed by the Architect/Engineer. 8/27/2015 jdacosta