1. Please identify the use, on drawings, of the space above the garage.

7/16/2015 jdacosta

2. Identify the Girder/Beam at the interior end of roof trusses B3, also identify the roof truss to beam hanger and posts to support girder/beam information.

7/16/2015 jdacosta

3. Provide a framing detail member size schedule for roof ceiling area of open space located above "Storage Area" adjacent to Bedroom #3.

7/16/2015 jdacosta

4. Unable to locate the Porch beam to masonry wall hanger info and post base connector listed on drawings. Please review and provide connectors currently available by manufacturer.

7/16/2015 jdacosta

5. Walls appear to be framed in 2X6 whereas the Energy form lists R13 insulation.

7/16/2015 jdacosta

6. Please submit the ES Report for the Spray Foam Insulation being used and identify the Thermal/Ignition Barriers being used.

7/16/2015 jdacosta
7. An additional fee due and payable at permitting shall be of $100 each for any second resubmission of plans. Per FL. Statute 553.80(2)(b), on any third and subsequent resubmissions that do not correct a code violation that is specifically and continuously noted in each previous rejection, a fee of four times the amount of the fee attributed to plan review will be charged. 7/16/2015 jdacosta
8. General Notes: Your re-submittal shall include two complete sets of plans. Please insert the revised pages into the plan sets, and pages removed from the stamped "Job copy" set, shall be marked as "old set" and shall be included in the re-submittal.
If old "Job copy" drawings, are not resubmitted there will be additional plan review fee charged due to the amount of time necessary to review entire drawing again.
ALL ITEMS changed or revised on plans and documents shall be identified by circling, clouding or identified by some other legible method. ADDITIONAL ITEMS MAY BE REQUIRED - DEPENDING ON INFORMATION AND CLARITY OF FINAL PLANS SUBMITTED FOR REVIEW.
7/16/2015 jdacosta
9. Pen and ink changes, white-outs, or any such altering of raised seal engineering drawings, is not permitted under state laws governing the practice of Architecture or Engineering. All information on the raised seal drawings must part of the printed sheets at the time the drawings are sealed by the Architect/Engineer. 7/16/2015 jdacosta