| | Department Issues | Signed Off | Intl |
|
|
1. There appears to be a section of interior footer missing. Please refer to foundation plan at floor truss F03 and F07. Please review and revise in applicable.
|
10/24/2014
| jdacosta |
|
|
2. Sheet S2.01, Shearwall note refers to, "Based on Typical Wall Section". It appears this detail may be missing. Please provider the shearwall sheathing fastening schedule, identify the exterior wall stud sizes. Also include the typical truss uplift connector for uplifts (0-1200#) not listed in table.
|
10/24/2014
| jdacosta |
|
|
3. The Structural Engineering indicates 7/16 roof sheathing, the Architectural drawings indicate 3/4 and the Florida Product approval for the metal roof cover indicates either 15/32 or 19/32 for the product being used. Please correlate.
|
10/24/2014
| jdacosta |
|
|
4, The Egineering identifies BB03, BB05 and BB06 headers. Please identify the sizes of these headers.
|
10/24/2014
| jdacosta |
|
|
5. Please identfy the Spray Foam Insulation being used and submit the ICC ES Report for the product.
|
10/24/2014
| jdacosta |
|
|
6. AS PER ORDINANCE # 98-42 An additional fee due and payable at permitting shall be of $100 each for any second resubmission of plans. Per FL. Statute 553.80(2)(b), on any third and subsequent resubmissions that do not correct a code violation that is specifically and continuously noted in each previous rejection, a fee of four times the amount of the fee attributed to plan review will be charged.
|
10/24/2014
| jdacosta |
|
|
7. General Notes: Your re-submittal shall include two complete sets of plans. Please insert the revised pages into the plan sets, and pages removed from the stamped "Job copy" set, shall be marked as "old set" and shall be included in the re-submittal. If old "Job copy" drawings, are not resubmitted there will be additional plan review fee charged due to the amount of time necessary to review entire drawing again. ALL ITEMS changed or revised on plans and documents shall be identified by circling, clouding or identified by some other legible method. ADDITIONAL ITEMS MAY BE REQUIRED - DEPENDING ON INFORMATION AND CLARITY OF FINAL PLANS SUBMITTED FOR REVIEW.
|
10/24/2014
| jdacosta |
|
|
8. Pen and ink changes, white-outs, or any such altering of raised seal engineering drawings, is not permitted under state laws governing the practice of Architecture or Engineering. All information on the raised seal drawings must part of the printed sheets at the time the drawings are sealed by the Architect/Engineer.
|
10/24/2014
| jdacosta |