SJC Home
Clearance Sheet R2014-002044

 Department IssuesSigned OffIntl

1. Site plan must show finish floor elevation for both house and garage and site drainage design

8/14/2014 jschock

2. Remove all non-sealed structural and foundation Drawings from submittal package. Only the sealed drawings need be submitted

8/14/2014 jschock

3. Notes such as recommended or suggestions must be removed the drawings must reflect the actual construction plan clarification will be required in field

8/14/2014 jschock

4. Provide all flashing details

8/14/2014 jschock

5. Provide stucco information for three coat stucco to include the requirements for a double drainage plain

8/14/2014 jschock

6. Provide information for Arc Fault protectiion

8/14/2014 jschock

7. Indicate Carbon Monoxide detection requirements (gas fireplace and/or stove)

8/14/2014 jschock