SJC Home
Clearance Sheet R2014-001515*004

 Department IssuesSigned OffIntl

1. PLANS MUST BE LEGIBLE. Documents will be electronically scanned to produce the final permanent record, therefore all documents must be clear, clean, with sufficient density, and having enough contrast to produce an acceptable scanned image.

----Span tables on sheet 5 are not legible please provide legible copies.

 

7/20/2026 janoda

2. Please provide the deck dimensions.

7/20/2026 janoda

3. I was unable to locate the load path or attachment for the deck to the existing structure.

----Please provide a detail providing attachments and bearing points supporting the deck.

7/20/2026 janoda

4. The drawing does not provide access to the deck located on the roof.

---- If the deck is going to be accessible please provide the means of ingress and egress for the deck. 

7/20/2026 janoda

5. Please provide the intended use of the deck located on the roof.

7/20/2026 janoda