1. HEALTH DEPARTMENT REVIEW REQUIRED: Please provide an approved Health Department Review and/or permit for the well and Septic systems. The approved Site and Floor Plan should appropriately match that of the Building plans.

9/21/2018 dking

2. Truss package is not reviewed by EOR.
Please submit a complete truss package, identified by EOR as meeting his design or provide letter verifying truss package has been reviewed by EOR (Engineer of Record). (FBC-R802.10.1).
(FL Rule 61G15-31.003)

9/14/2018 dking

3. ENGINEERING FOR THIS PROJECT APPEARS TO HAVE MISSING AND CONFLICTING STRUCTURAL ELEMENTS: Please review supporting structure and load path requirements for this structure (FBC-R107).

- Missing header callouts

- Please resolve conflicts between/with written Architectural Sealed Engineering and structural floor plans that need to be signed & sealed

9/14/2018 dking