SJC Home
Clearance Sheet R2012-002376*005

 Department IssuesSigned OffIntl

1. HEALTH DEPARTMENT REVIEW REQUIRED: Please provide an approved Health Department Review and/or permit for the well and Septic systems. The approved Site and Floor Plan should appropriately match that of the Building plans.

 

2. Truss package is not reviewed by EOR.
Please submit a complete truss package, identified by EOR as meeting his design or provide letter verifying truss package has been reviewed by EOR (Engineer of Record). (FBC-R802.10.1).
(FL Rule 61G15-31.003)

 

3. ENGINEERING FOR THIS PROJECT APPEARS TO HAVE MISSING AND CONFLICTING STRUCTURAL ELEMENTS: Please review supporting structure and load path requirements for this structure (FBC-R107).

- Missing header callouts

- Please resolve conflicts between/with written Architectural Sealed Engineering and structural floor plans that need to be signed & sealed