Clearance Sheet R2011-001391*003

 Department IssuesSigned OffIntl

1.  Elevation Certificate, Building under construction. 

Due to recent audits from FEMA and NFIP, we are reviewing all input on Elevation Certificates for correct information.
All lines must be complete and correct to comply with the NFIP program.
Please make the following corrections:

1.  Line B4  Please complete Panel Number.  (12109C0113)
2.  Line B7  Correct date is 9/02/2004
3.  Line C2.b  Higher floor is not shown on plans.
4.  Line C2.h  should be the same as or lower than C2.f (LAG)

 

2.  As built structure does not match plans.