SJC Home
Clearance Sheet R2010-000810

 Department IssuesSigned OffIntl

Received steel shop drawings reviewed with notes from EOR.
 
1. Please revised the shop drawings to add stiffeners plate at columns shown on sheets D1,D3, And D4.

2. Please revise the shop drawings to add studs to beams on sheets D1, D2, and D5.