Received shop drawings for the hollow core slabs, please provide shoring and reshoring plans that have been approved by the EOR.
Note: refer to the red line note on page 2 of the hollow core slab drawings and the bottom of the first paragraph of Chris Kathe letter " We assume the required concrete shoring is the responsibility of the contractor"