SJC Home
Clearance Sheet R2010-000810

 Department IssuesSigned OffIntl

1.  Please provide a copy of the DEP approved plans.

8/25/2010 JPAULA

2.  Please have the engineer of record complete a VE-Certification form. 

8/25/2010 JPAULA

3.  Please have the owners complete a non-conversion agreement that has been filed with the Clerk of the Court.

8/25/2010 JPAULA

4. Please provide a proposal from the engineer of record or an approved testing agency for the installation inspection of each piling. The final report is to include a foundation plans showing the location of each pile, site conditions, date, time, grout slump, concrete break, total number of installed piles, total length of installed piles, piles installed in accordance with drawings and specifications, exceptions to pile placements (as built), and description of installation equipment and procedure for installation.

8/25/2010 JPAULA

5.  The plans show an elevator installation that will be located partially below the BFE (14'NGVD). Please provide a section detail to show compliance with FEMA Technical Bulletin 4.

8/25/2010 JPAULA

6.  The septic system must be anchored to prevent damage to the structure or adjacent structures during a storm event. Please provide an anchoring detail for the septic system.

8/25/2010 JPAULA

7. A separate permit is required for the retaining wall. The retaining wall must structurally analyzed for the effect on flood conditions, including the ramping effect on adjacent buildings and the effects of debris during a flood event.

8/25/2010 JPAULA

8.  The piling layout shown on S-1 shows some piling less than the 8:1 design ratio to pile diameter. Please revise the pile spacing to comply with FBC 3109.4.1.

8/25/2010 JPAULA

9.  Please provide roofing details for both walking and non-walking surfaces. Provide product approval that coincides with the details.

8/25/2010 JPAULA

10.  Please provide steel shop drawing that have been reviewed and approved by the engineer of record.


Wednesday, August 25, 2010  Approved with hold

8/25/2010 JPAULA

11.  Please provide a detail for the waterproofing of the balcony walking surface.

8/25/2010 JPAULA

12. Please provide hollow core engineering that has been reviewed and approved by the engineer of record.

Wednesday, August 25, 2010 Approved with hold

8/25/2010 JPAULA

13.  Please provide a concrete shoring and reshoring plan reviewed and approved by the engineer of record.
 
Wednesday, August 25, 2010  Approved with hold

8/25/2010 jpaula

14.  The project is located seaward of the DEP CCCL line and the FEMA VE zone. Space below the 100 year storm elevation (CCCL 17.3 NGVD) and the FEMA BFE (14 NGVD) is limited to storage of vehicles, storage of equipment eg. lawnmower, and access to the building. 

On multiple architectural and structural sheets show lighting and receptacles, 3 HVAC units and ductwork, washer/dryer, sinks, multiple interior partitions with trim and drywall.

Note: Refer to FEMA TB-2

This area is limited to an unconditioned, unfinished area with a smoke detector, carbon monoxide sensor, limited lighting for safety and few receptacles above the BFE. Please remove all references  from the plans that do not comply with 3109.4.2 and LDC 3.03.02D5(c).

8/25/2010 jpaula