1. Please provide all plans and details for the safe room/storm shelter. FEMA 320 designs are acceptable. Other designs must be submitted for approval separately, prior to being attached to the plans. Footings must be shown on the foundation plans.
|
| |
|
|
2. Please review the rebar spacing. The O.C. spacing and additional required rebar at sides of openings does not comply with FBC-R609.3 and tables R609.3.3A or R609.3.3B.
|
6/18/2010
| jdacosta |
|
|
3. Please provide detail for wood framed entry that includes the sheathing size/fastening specs, and a complete load path from roof trusses to masonry wall. If sheathing is "combined use", system will need to comply with APA document SR-101B. Also include the fastening/connection requirements for the false knee wall, as it is wind loaded also.
|
| |
|
|
4. Please specify the "structural" ceilings and attachment for the "enclosed" structural design, as gypsum alone is not approved.
|
6/18/2010
| jdacosta |
|
|
5. Please include the current 2008 NEC Electrical code edition in the code statements.
|
6/18/2010
| jdacosta |
|
|
6. Please correct or adjust the insulation values on sheet G0.2 as they conflict with the Energy Calcs.
|
6/18/2010
| jdacosta |
|
|
7. The R10 detail as referenced on sheet S3.1B is missing from the plans.
|
6/18/2010
| jdacosta |
|
|
8. Please reference detail R20 to the proper sheet. (There is no sheet S3.1).
|
6/18/2010
| jdacosta |
|
|
9. Please clarify the window sizes on the plans. They are not included in the Design Pressure Calcs table on sheet S2.1, and there is no conversion chart for the designations.
|
| |