SJC Home
Clearance Sheet R2010-000397

 Department IssuesSigned OffIntl

1.  Truss package dead loads do not match Engineering.  Please
    clarify.

 

2. Foundation plan does not show footing under interior shear wall.
   Please clarify.

 

FYI: Future living space above garage will require floor/ceiling
     assembly to be insulated to R-19 and 5/8" Type X drywall 
     installed at ceiling.  If noted on current plans, future
     building permits will be easier to obtain.