| | Department Issues | Signed Off | Intl |
|
|
1. Please state all design criteria, including current Building Code and ASCE7 Editions.
|
| |
|
|
2. This building is designed as Wind Exposure C; trusses are designed as Exposure B. Please submit new truss package.
FYI: Roof framing was not reviewed.
|
| |
|
|
3. At least one full bathroom, on ground floor, must have 29" clear openings into all areas of bathroom, per FRC 322.1.1. (2'-8" swing door or 2'-6" pocket door)
|
| |
|
|
4. FYI: Second floor electric page is missing. (Electric pages are not required)
|
| |
|
|
5. Energy Sheets: Insulation in area over garage is unclear, raised floor and adjacent wood frame wall insulation does not match. Please review insulation in these areas.
Unvented attic space is only approved in certain circumstances. Please review FRC 806. If spray foam insulation is proposed, please submit all details.
|
| |
|
|
6. Building height appears to be over the maximum 35 feet. Building height is measured from the lowest grade found on the building perimeter, six feet away from the exterior wall.
|
| |
|
|
General Notes: Your re-submittal shall include two complete sets of plans. Please insert the revised pages into the plan sets, and pages removed from the stamped "Job copy" set, shall be marked as "old set" and shall be included in the re-submittal. If old "Job copy" drawings, are not resubmitted there will be additional plan review fee charged due to the amount of time necessary to review entire drawing again. ALL ITEMS changed or revised on plans and documents shall be identified by circling, clouding or identified by some other legible method. ADDITIONAL ITEMS MAY BE REQUIRED - DEPENDING ON INFORMATION AND CLARITY OF FINAL PLANS SUBMITTED FOR REVIEW.
|
| |