SJC Home
Clearance Sheet R2009-000626

 Department IssuesSigned OffIntl

1 - Please submit the rear porch beam specifications (size, type, and connectors) as a Revision prior to Inspection #101 to release the Hold. This submittal must be signed and sealed by the engineer of record.

2 - Submit the method of Opening Protection as a Revision prior to Inspection #101 to release the Hold.

3 - There are no further comments at this time.