SJC Home
Clearance Sheet R2008-000227*002

 Department IssuesSigned OffIntl

1. It appears the structural drawings are not submitted with the permit application.

----Please provide structural drawings complying with FBCR R322

 

2. Please provide the V-Zone Design and Performance Certificate from the Engineer.

https://www.sjcfl.us/wp-content/uploads/2023/08/V-Zone-Building-Design-and-Performance-Certificate.pdf

 

3. Please provide Pile Installation Inspection acknowledgment report before permitting.

https://www.sjcfl.us/wp-content/uploads/2023/08/Affidavit-to-Acknowledge-the-Requirement-for-a-Pile-Installation-Inspection-Report.pdf