SJC Home
Clearance Sheet R2007-000391

 Department IssuesSigned OffIntl

1.  The truss engineering requires review and approval by the Engineer-of-Record (EOR) Wayne P. Block, PE (note the truss documents submitted show the EOR to be some other individual).

 

2.  EOR confirm zero uplift loads on all B and C roof trusses, and on roof trusses H-01A and J-01A.