| | Department Issues | Signed Off | Intl |
|
|
1. Please submit new foundation details showing bond beam, required in FBC-R404.1.1.1.
|
| |
|
|
2. This project is located in an AE 7 flood hazard area. Indicate proper hydrostatic openings, on foundation detail, required by FEMA/NFIP. See FEMA Technical Bulletin 1-93.
|
| |
|
|
3. Indicate c/c of threaded rod anchor bolts, on wall section.
|
| |
|
|
Provide details on plans for flashing wall openings per BOAF First Coast Chapter Codes and Standards Committee Bulletin. www.firstcoastchapter.org committee codes&standards flashing bulletin
|
| |
|
|
5. All drawings, including Site plan, must show ARC Approval.
|
| |