Clearance Sheet R2006-003568

 Department IssuesSigned OffIntl

1.  Please submit new foundation details showing bond beam, required in FBC-R404.1.1.1.

 

2.  This project is located in an AE 7 flood hazard area.  Indicate proper hydrostatic openings,
    on foundation detail, required by FEMA/NFIP.  See FEMA Technical Bulletin 1-93. 

 

3.  Indicate c/c of threaded rod anchor bolts, on wall section.

 
Provide details on plans for flashing wall openings per BOAF First Coast Chapter Codes and Standards Committee Bulletin. www.firstcoastchapter.org committee codes&standards flashing bulletin  

5.  All drawings, including Site plan, must show ARC Approval.