1.  Engineering states Wind Exposure Category is C+ (Plus 20% ?)
    Truss engineering states Exposure B.  Please clarify.
    If C+20%, EOR specify truss uplift loads.
    Truss pages must be signed off by EOR.

    Components and cladding tables on Pages 1 and 2.2 do not match.

 

2.  Please specify and detail exterior wall covering over gable-end
    truss.  Decorative Cementitious Coating does not qualify, per
    FRC, Chapter 7.

 

3.  Product Approval Sheets:
    Products not verified until Wind Exposure (See Issue 1)
    Window 663 not found online.
    Provide roofing underlayment.
    Provide opening protection.

 

4.  Interior footings do not match truss layout.

 

5.  Please clarify window sizes and types.

 

6.  Electric: 
    -specify CO detectors and locations on plans, per FBC-R313.
    -depending on bath window, 2 fans may be required in bathroom.

 

7.  Plans must legible to scan into permanent record and construct
    building.  Tables on Page 1 are not legible.

 

8. Please provide details for bond beam and rebar location lintels.
   Please verify garage door lintel.

 

9.  Please review FBC-R609.3 and vertical rebar at openings on
    plans.  Provide details for openings.

 

10. Please submit porch ceiling materials and details. 
    Building is designed as Enclosed.
    Verify angled hanger for porch beam.

 
NOT A COMPLETE LIST.
General Notes: Your re-submittal shall include two complete sets of plans. Please insert the revised pages into the plan sets, and pages removed from the stamped "Job copy" set, shall be marked as "old set" and shall be included in the re-submittal.
If old "Job copy" drawings, are not resubmitted there will be additional plan review fee charged due to the amount of time necessary to review entire drawing again.
ALL ITEMS changed or revised on plans and documents shall be identified by circling, clouding or identified by some other legible method. ADDITIONAL ITEMS MAY BE REQUIRED - DEPENDING ON INFORMATION AND CLARITY OF FINAL PLANS SUBMITTED FOR REVIEW.