Received piling inspection report from Universal. Please have report revised to include all of the following.
Foundation plans showing the location of each pile, site conditions, date, time, grout slump, concrete break, total number of installed piles, total length of installed piles, piles installed in accordance with drawings and specifications, exceptions to pile placements (as built), and description of installation equipment and procedure for installation.